Projects

Oe pier berth repair construction (Phase 2)


DATA

In March, 2007, "Future Direction of Port of Nagoya" was formulated anticipating 20 years from now.
As a part of that they decided to build seismic strengthened berth in entire port to minimize the influence in goods' supply to hinterland or with local activities due to the disaster.
This project was to improve Oe pier, which didn't meet earthquake standards, as a seismic strengthened berth.
Project Oe pier berth repair construction (Phase 2)
Period March, 2016 - July, 2017
Client Nagoya port authority
Contractor JV of Penta-ocean construction Co., Ltd, Tokura corporation and Kojimagumi.
※Penta-Ocean is the main (50%) and Kojimagumi as 3rd member (20%).
Location Chisaki, Oe-cho, Minato-ku, Nagoya (Berth No. 38)
Outline This was a seismic strengthening work of Oe pier.