Projects

Port basin dredging (Phase 3)


DATA

This project was to maintain the function of port facility (basin and berth front) by dredging the sediment. Dredged soil was unloaded to reclamation site in Yatomi pier lumberyard No.1 in Nagoya port.
Project Port basin dredging (Phase 3)
Period December, 2015 ~ October, 2016
Client Nagoya port authority
Location Nagoya port (Garden pier, Inae pier, Funami pier, Lumberyard No.1)
Outline Dredging:Grab dredging
Unloading:Unloading by barge unloader 

Grab dredger(CHUKO MARU, 18m3)×1
Barge unloader(P-3000 RYOSEI MARU, 1800PS)×1
Pusher boat(2000PS)×1, Sealed box barge(1600m3)×2

Ship