Projects

Comprehensive flood control for specified river
(Nationwide disaster) (Phase 8)


DATA

This project was to lower the Sakaigawa River's riverbed by dredging to prevent the disaster as flood due to heavy rain.
Dredged soil was transported to Kinuura port as backfill material for Fukahori area in north of Kinuura tunnel.
Project Comprehensive flood control for specified river (Nationwide disaster) (Phase 8)
Period June, 2015 - September, 2015
Client Chiryu construction office, Aichi prefecture
Location Sakaigawa River (Class B river)(Chisakihajime, Koromozaki-cho, Kariya, Aichi)
Outline Riverbed excavation work: V=20,300m3 L=177m
Dumping (backfill): V=64,800m3